Tilt correction: "Underpinning method" for correcting building tilt.
By performing a jack-up at the top of the steel pipe piles, the tilt of the building is corrected!
"Underpinning Method" This method involves extending steel pipes beneath the foundation of a structure while using the building's own weight as a reaction force. The steel pipe piles are driven into the ground, and by performing a jack-up at the top of the steel pipe piles, the tilt of the building is corrected. Since the steel pipe piles are driven down to the supporting ground and act as support piles, there is no risk of the building settling again. This method is suitable for small to medium-sized structures. 【Features】 ■ Can be implemented even for heavy structures ■ Selection of steel pipe diameter based on load ■ Flexible arrangement of steel pipes *For more details, please refer to the PDF document or feel free to contact us. Toll-free number: 0120-873-835
- Company:メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡
- Price:Other